Bathrooms done waterproof first

Small rooms with the most water, the most code and the least room for error. We rebuild bathrooms so the waterproofing behind the tile is as good as the tile itself.

Arlington, Mansfield, Midlothian & the DFW Metroplex Mon–Sat 7:00am–5:00pm

Bathroom failures almost never start with the tile. They start behind it: cement board screwed over drywall, a pan that was never pre-sloped, no vapour barrier at the shower wall. It looks perfect for two years, then the subfloor softens.

We rebuild the wet area properly — substrate, waterproofing, slope and drain — then finish it. If we open a wall and find old water damage, you get photos and a price before we touch it.

What’s included

Every bathroom remodeling quote is built from these pieces. Anything outside the scope is written on the quote as an exclusion, so you are never guessing what you bought.

  • Demo with dust control and haul-off
  • Valve, drain and supply line updates
  • Cement board and roll-on waterproofing
  • Floor and shower tile with proper slope
  • Vanity, counter, mirror and fixtures
  • Exhaust fan, paint and final seal

What drives the price

We do not publish a fake flat price, because two bathroom remodeling jobs on the same street can differ by thousands. These are the variables that move the number — you will see them broken out on your quote.

Tub versus walk-in shower

A curbless walk-in with a linear drain takes more framing, waterproofing and glass than a standard tub surround.

Tile selection

Large-format porcelain is quicker to set; small mosaic and herringbone patterns take far more labour per square foot.

Layout changes

Moving a toilet or shower drain means breaking concrete on a slab — priced separately and worth deciding early.

Glass and fixtures

Frameless glass, niche work and premium fixtures are specified lines, so they are quoted by name rather than as an allowance.

Double vanity and new floor tile
Double vanity and new floor tile
Tiled walk-in shower with grab bar
Tiled walk-in shower with grab bar

How the job runs

1. Free walk-through. We come to you, look at the space and talk through options. No pressure and no deposit to get a number.

2. Written quote. Itemized scope, materials named, price held. You approve it before anything is ordered.

3. We build. Crew on site, site protected, updates as we go. If something changes behind a wall, you see photos and a price before we continue.

4. Final walk. We finish the punch list with you, clean up, and leave the warranty and care notes behind.

Questions we get asked

Can you convert my tub to a walk-in shower?
Yes — it is one of the most common projects we do. On a slab it usually means relocating the drain, which we price before demo so there is no surprise when the concrete opens up.
How long does a bathroom take?
A hall bath refresh runs one to two weeks. A full primary rebuild with a custom shower usually takes three to four weeks on site, depending on tile and glass lead times.
What if you find water damage?
We stop, send photos, and give you a price to repair the framing or subfloor before continuing. Nothing gets covered back up until you have approved it.
Serving Arlington, Mansfield, Midlothian & the DFW Metroplex. Most bathroom remodeling projects can be scheduled within a couple of weeks — call (817) 666-0442 for the honest date.

Ready for a real number?

Free walk-through, written quote, and a start date we will actually keep.