Bathroom failures almost never start with the tile. They start behind it: cement board screwed over drywall, a pan that was never pre-sloped, no vapour barrier at the shower wall. It looks perfect for two years, then the subfloor softens.
We rebuild the wet area properly — substrate, waterproofing, slope and drain — then finish it. If we open a wall and find old water damage, you get photos and a price before we touch it.
What’s included
Every bathroom remodeling quote is built from these pieces. Anything outside the scope is written on the quote as an exclusion, so you are never guessing what you bought.
- Demo with dust control and haul-off
- Valve, drain and supply line updates
- Cement board and roll-on waterproofing
- Floor and shower tile with proper slope
- Vanity, counter, mirror and fixtures
- Exhaust fan, paint and final seal
What drives the price
We do not publish a fake flat price, because two bathroom remodeling jobs on the same street can differ by thousands. These are the variables that move the number — you will see them broken out on your quote.
Tub versus walk-in shower
A curbless walk-in with a linear drain takes more framing, waterproofing and glass than a standard tub surround.
Tile selection
Large-format porcelain is quicker to set; small mosaic and herringbone patterns take far more labour per square foot.
Layout changes
Moving a toilet or shower drain means breaking concrete on a slab — priced separately and worth deciding early.
Glass and fixtures
Frameless glass, niche work and premium fixtures are specified lines, so they are quoted by name rather than as an allowance.


How the job runs
1. Free walk-through. We come to you, look at the space and talk through options. No pressure and no deposit to get a number.
2. Written quote. Itemized scope, materials named, price held. You approve it before anything is ordered.
3. We build. Crew on site, site protected, updates as we go. If something changes behind a wall, you see photos and a price before we continue.
4. Final walk. We finish the punch list with you, clean up, and leave the warranty and care notes behind.